1946 1949 1954 1963 1964 1965 1970 1971 1972 1975 1982 1985 1987 1988 1989 1997 1998 1999 2001 2003 2005 2006 2007 2008 2009 2010 2011 2012 2014 2015 2016 2017
keymark timeline
1987

With industry demand increasing for high quality, 2-step (architectural) anodizing Keymark undertakes the next major expansion. A state of the art anodizing line is designed for installation in a new 60,000 square foot facility to replace the original line installed in 1965. Also included is a high tech Azon thermal break line.